In response to concerns from residents, we are continuing to work to resolve a number of highways issues in the ward. Below is a log of all the projects and their current status (as at 3 June 2009).

Location

Issue

Status

Avonmead

Speed survey

Completed

Blunsdon Road

Yellow lines requested near junction with Thames Avenue

Request recorded by officers

Elstree Way

Survey to ascertain need (or not) for a crossing

Footfall survey done. Request recorded by officers.

Hamble Road junction with Avonmead

White junction lines requested

Request recorded by officers. Will be done when other work in the area is planned.

Haydonleigh Drive / Foxglove Road

Parking / speed / redrawing of lines

Scheme completed Feb 2007

Haydonleigh Drive / Westfield Way junction

Remodelling of roundabout and islands

Completed

Haydonleigh Drive and also HD junction with Brookdene Speed of vehicles. Speed survey requested along with consideration of mini roundabout at this junction Request submitted May 2009

High Street

Yellow lines to be removed outside 28-34

Completed

High Street / Blunsdon Road

An assessment of the road surface, camber and kerbs

Work will be done once Thames Water has done work on foul water drains.

Isis Close, Tamar Close, Dart Avenue

Junction lines to be introduced

Completed

James Wilks House (Brookdene) to Morrisons

Footpath across the green to join the two locations

Request logged but not seen to be best use of resources.

Kennet Avenue

Paint white lines in parking bays to ensure the maximum number of vehicles can park in the space

Requested September 2008 and logged by the Highways department

Kennet Avenue

Bollard requested to stop parking on verges

Installed March 2007

Paddock Close Junction with Blunsdon Road - road markings and trafic speeds and volumes need looking at Reported January 2009

Pen Close

Double yellow lines to be introduced including part of Thames Avenue and Dart Avenue.

Scheme completed Feb 2007

Rushmere Path underpass

To fill in or not?

Work considered by Project Board but rejected as impractical and very expensive.

Severn Avenue

Road resurfacing

Work completed October 2007

Severn Avenue Speed of traffic particularly around school times Request logged for speed survey May 2009

Severn Avenue / Thames Avenue

Double yellow lines needed near corners.

Request recorded by officers

Thames Avenue chicane by Parish Offices Request for removal and installation of a crossing opposite pharmacy Part of Thames Avenue review.

Thames Avenue (Shops to Old Blunsdon Road)

Police Survey completed

Police to be asked to enforce.

Thames Avenue (Traffic calming outside 63)

Resident complaint logged

Part of Thames Avenue review.

Thames Avenue cul-de-sac Resident requested removal of two bollards at middle of road. Request logged with the Highways department 11 October 2008

Thames Avenue

Vehicle Speed Activated Signs

Erected June 2008

Thames Avenue

Bollard requested in cul-de-sac

Part of Thames Avenue review

Trent Road

Proposed introduction of yellow lines

Revised scheme proposal awaited

Westfield Way / Thames Avenue junction

Mini Roundabout needed

Completed

Westfield Way path

Path needed
www.haydonwickintouch.com
/news799.html

Completed Jan 2007

Westfield Way

Bump in road above Rushmere Path underpass

Completed mid 2006

Westfield Way

Vehicle Speed Activated Signs

Request logged and will be considered in next round of VASs.