Roadworks
|
Below is a list of planned and completed work to the roads, paths and utilities in Haydon Wick as at 5 March 2010. Works are ordered by expected date of completion. | |||
|
Road(s) |
Details |
Start |
Finish |
| Thames Avenue |
Swindon Commercial Services to carry out works to bus stop and zebra crossing including works to the kerb |
1 Mar 2010 |
TBA |
| Severn Avenue and some of the roads off Severn | Replacement of street lighting to be done by Swindon Commercial Services and Scottish and Southern Electric. To be done in conjunction with flood alleviation works. |
2009 |
2012 |
| Thames Avenue (footpath 31) | Flood alleviation scheme. Temporary closure of footpath 31 at 91 Thames Avenue to 22/24 Frome Road. Alternative route: Hamble Road, Thames Avenue and vice versa. |
29 Jun 2009 |
25 Jun 2010 |
| Thames Avenue (footpath) | Flood alleviation scheme. Temporary footpath closure adjacent to 177 to adjacent 20 Wicks Close. Local diversion will be in place. |
02 Apr 2009 |
10 May 2010 |
| Severn Avenue (road closure) | Flood alleviation. Temporary road closure from the junction of Orwell Close to junc with Emmanuel Close |
28 Jul 2009 |
31 Mar 2010 |
| Orwell Close (road closure) | Flood alleviation. Temporary road closure of entire length. Access for residentswill be maintained where practicable. |
06 Jul 2009 |
31 Mar 2010 |
| Hamble Road | Flood alleviation. Temporary road closure from No 8 to junc Frome Road |
29 Jun 2009 |
31 Mar 2010 |
| Green Valley Avenue - road closure | Flood alleviation. Temporary road closure. Access will be from Hamble Road when High Street is closed off. There will be no through route |
04 Aug 2009 |
31 Mar 2010 |
| Blunsdon Road (incl Lady Lane / Westfield Way) South of Thames Avenue | Haydon Wick flood alleviation scheme. Upsize and replace foul sewer and laterals by open cut and insertion. Three stages - High Street to Thames Avenue; Thames Avenue to Pond Street including Blunsdon Road and Pond Street; Lady Lane to Blunsdon Road. Will involve road closures and temporary traffic lights. |
1 May 2009 |
31 Mar 2010 |
| High Street (road closure) | Flood alleviation. Temporary road closure from junction with The Brow to junc of Green Valley Ave |
30 Jun 2009 |
31 Mar 2010 |
| Thames Avenue o/s Morrisons supermarket | Construction of zebra crossing, re-siting of bus stop, anti skid and removal of build-out |
15 Feb 2010 |
26 Feb 2010 |
| High Street (footpath 1) | Temporary footpath closures for flood alleviation scheme. Footpath west of High St, from Haydon Court to Brookdene Lodge |
21 Jan 2010 |
03 Feb 2010 |
| Wicks Close | Flood alleviation works. Temporary footpath closure, from adjacent to 20 Wicks Close to 177 Thames Avenue |
03 June 2009 |
23 Jan 2010 |
| Thames Avenue (footpath 23) | Flood alleviation scheme. Temporary footpath closure from junc Thames Avenue to junc Severn Avenue. Local diversion will be in place. |
09 Sep 2009 |
27 Oct 2010 |
| Coln Crescent (footpath 25) | Temporary closure of footpath from adjacent to No 25 to junction with footpath 23 in Trent Road. Alternative route Thames Ave to Severn Ave |
09 Sep 2009 |
21 Oct 2009 |
| Akenfield - Footpath behind | Closure in order to construct a cycleway |
3 Aug 2009 |
30 Sep 2009 |
| Green Valley Avenue - footpath | Flood alleviation. Temporary footpath closures. Footpath adjacent to northern carriageway between junc with High St and Green Valley Ave. Footpath between Green Valley Ave to junc with Hamble ROad is to be opened for vehicular traffic |
04 Aug 2009 |
15 Sep 2009 |
| Churchfield | Flood alleviation scheme will involve road closures and temporary traffic lights |
25 Aug 2009 |
15 Sep 2009 |
| Avonmead - road closure | Flood alleviation. Temporary road closure from junction Sherford Rd to end cul-de-sac serving 120-132. Access for pedestrians where practicable |
24 Aug 2009 |
07 Sep 2009 |
| High Street (footpath 20) | Flood alleviation. Temporary footpath closure from point adjacent 12 High St to the end of King George V field |
27 Jul 2009 |
28 Aug 2009 |
| Blunsdon Road (incl Lady Lane / Westfield Way) North of Thames Avenue | Haydon Wick flood alleviation scheme. Upsize and replace foul sewer and laterals by open cut and insertion. Three stages - High Street to Thames Avenue; Thames Avenue to Pond Street including Blunsdon Road and Pond Street; Lady Lane to Blunsdon Road. Will involve road closures and temporary traffic lights. |
01 Jul 2009 |
7 Jul 2009 |
| Chatsworth Road, footpath west of | Flood alleviation scheme. Temporary closure of footpath adjacent to rear of 81 Chatsworth Road to junc Blunsdon Road |
16 Jun 2009 |
7 Jul 2009 |
| Calder Close | Contractor to dig shaft as part of flood alleviation works |
15 Jun 2009 |
6 Jul 2009 |
| Orwell Close (footpath 60) | Flood alleviation works by Thames Water. Temporary footpath closure from Orwell Close to Calder Close |
02 Jul 2009 |
16 Jul 2009 |
| Deben Crescent Road closure | Flood alleviation works. Temporary road closure from No 17 to end of cul-de-sac. Access for residents only where practicable. |
02 Jun 2009 |
16 Jul 2009 |
| Calder Close (footpath 59) | Flood alleviation. Temporary footpath closure from Deben Crescent to Calder Close, alternative route will be in place |
18 June 2009 |
16 Jul 2009 |
| Deben Crescent (footpath 59) | Flood alleviation. Temporary footpath closure from Deben Crescent to Calder Close, alternative route will be in place |
18 Jun 2009 |
02 Jul 2009 |
| High Street (footpath 1) | Temporary footpath closures for flood alleviation scheme. Footpath closure from adjacent to 1 High St to rear of 16 Mellow Ground |
01 May 2009 |
29 Jun 2009 |
| Thames Avenue | Flood alleviation scheme. Temporary road closure from junc Blunsdon Road to junc Wicks Close. Diversion will be in place via High Street, The Brow, Haydonleigh Drive and Westfield Way and vice versa. |
05 May 2009 |
23 Jun 2009 |
| Holmleigh (outside nos 1 - 25 | Southern Electric to overlay existing lv cables. |
26 Jan 2009 |
20 Feb 2009 |
| Wheatlands | Scottish and Southern energy to overlay existing cables inc joint holes |
05 Jan 2009 |
30 Jan 2009 |
| High Street | Temporary traffic signals to be used by Thames Water in conjunction with flood alleviation works |
28 Jul 2008 |
21 Sep 2008 |
| Avonmead | Sewer repair works from 82 to 1 Sherford (side of). Works to be undertaken by Thames Water as part of the flood alleviation scheme |
17 Jul 2008 |
01 Sep 2008 |
| High Street | Sewer repair works to be undertaken by Thames Water as part of the flood alleviation scheme |
14 Jul 2008 |
29 Aug 2008 |
| Churchfield | Sewer repair works to be undertaken by Thames Water as part of the flood alleviation scheme |
14 Jul 2008 |
29 Aug 2008 |
| Elstree Way near Lady Lane junction | Installation of hv cable to be undertaken by Scottish and Soutern Energy |
20 Feb 2008 |
14 Mar 2008 |
| Helmsdale / Torridge Close / Haydon Court | Scottish and Southern Energy laying new cables. |
2 Jan 2008 |
29 Feb 2008 |
| Elstree Way at jnc with Lady Lane and Shepperton Way | Scottish and Southern Energy overlay works |
7 Jan 2008 |
28 Jan 2008 |
| Pen Close | Road closure to allow SCS to carry out resurfacing works between 9am and 5pm. |
21 Aug 2007 |
24 Aug 2007 |
| Haydon End Lane | Temporary Closure between Osterley Road and a point 50m beyond end of Capesthorne Drive. Diversion is via Osterley Road and Capesthorne Drive. |
01 Jul 2007 |
08 Sep 2007 |
| High Street (adjacent to no 2) | Installation of gulley and frame in carriageway with temporary traffic control. |
12 Mar 2007 |
16 Mar 2007 |
| Blunsdon Road | Works to culvert by Halcrow. Access will be maintained for pedestrians. |
05 Feb 2007 |
05 Feb 2007 |
| Westfield Way | Building of new footpath and crossing between Thames Avenue and Osterley Road. Signalling in place as required. |
Nov 2006 |
Jan 2007 |
| Westfield Way Roundabouts | Resurfacing Works - www.haydonwickintouch.com/ news_detail.php?nid=991 |
16 Oct 2006 |
10 Dec 2006 |
| Whitwoth Road / Thames Avenue roundabout | Resurfacing Works www.haydonwickintouch.com/ news_detail.php?nid=991 |
16 Oct 2006 |
10 Dec 2006 |
| Haydon End Lane | Closure to vehicular traffic for works to take place to footway / cycleway. |
06 Mar 2006 |
08 Sep 2006 |
| Thames Avenue | Installation of Kassell Kerbs at bus stops to enable passengers to enter and exit the bus on one level. |
17 Jul 2006 |
18 Aug 2006 |
| Lady Lane Cycleway | Installation of O2 telephone apparatus |
26 Jun 2006 |
21 Jul 2006 |
| Footpath 3 which crosses Haydon Brook for 20m | Temporary closure. Alternative route via crossing approx 100m east of closure. To allow contractor to repair bridge. |
17 Jul 2005 |
11 Jun 2006 |
| Westfield Way adjacent to Primrose Close | Replacement of sewer cover in carriageway, with temporary traffic signals for one day. |
05 May 2006 |
05 May 2006 |
| Haydon End Lane (near Priory Vale) | Closure of section of carriageway. Contractor to construct new sewers and carriageway. Alternative route via temporarily constructed carriageway. |
11 Nov 2005 |
01 Apr 2006 |
| Footpath along Westfield Way | Programmed for construction March 2006 | ||
| Westfield Way (Woodhall r/a - Rosemary Close r/a) | Improvements to carriageway |
13 Feb 2006 |
23 Feb 2006 |
| Corfe Close + Avonmead 3,5 & 9 | Mains and service works by Wales and West |
30 Jan 2006 |
20 Feb 2006 |
| Resurfacing of Westfield Way | Uneven carriageway to be repaired |
30 Jan 2006 |
3 weeks |
| Arun Road | Mains and service work by Wales and West Utilities |
3 Jan 2006 |
30 Jan 2006 |
| Avonmead | Transco will be carrying out mains and service work. Temporary traffic control will be in place. |
15 Aug 2005 |
15 Jan 2006 |
| Thamesdown Drive | Duct laying by BT. Lane closures as necessary. |
10 Nov 2005 |
04 Jan 2006 |
|
Avonmead cul-de-sac to 111 Thrushel Close and Sherford Road (Provisional) |
Micro-asphalt to carriageway. Road closed with access for residents and emergency vehicles. Traffic marshals on site to guide vehicles. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671. |
28 Sep 2005 |
12 Oct 2005 |
| Wicks Close | Micro-asphalt to carriageway. Road closed with access for residents and emergency vehicles. Traffic marshals on site to guide vehicles. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671. |
28 Sep 2005 |
12 Oct 2005 |
| Paddock Close | Micro-asphalt to carriageway. Road to remain open with lane closure controlled by traffic marshals. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671. |
28 Sep 2005 |
12 Oct 2005 |
| Thames Avenue / Blunsdon Road | Transco will be carrying out mains and service work. Temporary traffic control will be in place. |
08 Aug 2005 |
12 Sep 2005 |
| High St, The Brow, Blunsdon Road, Green Valley Avenue |
Transco will be carrying out mains and service work. Temporary traffic control will be in place as necessary, two or three way signals. |
05 May 2005 |
02 Sep 2005 |
| Thames Avenue / Blunsdon Road junction |
Transco will be carrying out mains and service work. Temporary traffic control will be in place. |
22 Aug 2005 | |
8 March 2010
Regular readers of our articles will know that we have been working for some months with residents, Thames Water and the Borough and Par
3 March 2010
We have just been advised by Swindon Borough Council that Abbey Meads Community Primary School and Greenmeadow Primary
1 March 2010
We receive regular reports from the Borough Council on what local residents have been calling in about.
In February easi
1 March 2010
Conservatives Will Allow Local Communities To Shape The Future Character Of Their Neighbourhoods - Unlike Labour, Who Turned House buil
26 February 2010
During the last month, we held a poll on how residents thought the Council was dealing with the problem of pot holes after the damag
26 February 2010
We are delighted to announce we have just been advised that Persimmon Homes has agreed to change the covenant on the land adjacent