Below is a list of planned and completed work to the roads, paths and utilities in Haydon Wick as at 5 March 2010.

Works are ordered by expected date of completion.

Road(s)

Details

Start

Finish

Thames Avenue

Swindon Commercial Services to carry out works to bus stop and zebra crossing including works to the kerb

1 Mar 2010

TBA

Severn Avenue and some of the roads off Severn Replacement of street lighting to be done by Swindon Commercial Services and Scottish and Southern Electric. To be done in conjunction with flood alleviation works.

2009

2012

Thames Avenue (footpath 31) Flood alleviation scheme. Temporary closure of footpath 31 at 91 Thames Avenue to 22/24 Frome Road. Alternative route: Hamble Road, Thames Avenue and vice versa.

29 Jun 2009

25 Jun 2010

Thames Avenue (footpath) Flood alleviation scheme. Temporary footpath closure adjacent to 177 to adjacent 20 Wicks Close. Local diversion will be in place.

02 Apr 2009

10 May 2010

Severn Avenue (road closure) Flood alleviation. Temporary road closure from the junction of Orwell Close to junc with Emmanuel Close

28 Jul 2009

31 Mar 2010

Orwell Close (road closure) Flood alleviation. Temporary road closure of entire length. Access for residentswill be maintained where practicable.

06 Jul 2009

31 Mar 2010

Hamble Road Flood alleviation. Temporary road closure from No 8 to junc Frome Road

29 Jun 2009

31 Mar 2010

Green Valley Avenue - road closure Flood alleviation. Temporary road closure. Access will be from Hamble Road when High Street is closed off. There will be no through route

04 Aug 2009

31 Mar 2010

Blunsdon Road (incl Lady Lane / Westfield Way) South of Thames Avenue Haydon Wick flood alleviation scheme. Upsize and replace foul sewer and laterals by open cut and insertion. Three stages - High Street to Thames Avenue; Thames Avenue to Pond Street including Blunsdon Road and Pond Street; Lady Lane to Blunsdon Road. Will involve road closures and temporary traffic lights.

1 May 2009

31 Mar 2010

High Street (road closure) Flood alleviation. Temporary road closure from junction with The Brow to junc of Green Valley Ave

30 Jun 2009

31 Mar 2010

Thames Avenue o/s Morrisons supermarket Construction of zebra crossing, re-siting of bus stop, anti skid and removal of build-out

15 Feb 2010

26 Feb 2010

High Street (footpath 1) Temporary footpath closures for flood alleviation scheme. Footpath west of High St, from Haydon Court to Brookdene Lodge

21 Jan 2010

03 Feb 2010

Wicks Close Flood alleviation works. Temporary footpath closure, from adjacent to 20 Wicks Close to 177 Thames Avenue

03 June 2009

23 Jan 2010

Thames Avenue (footpath 23) Flood alleviation scheme. Temporary footpath closure from junc Thames Avenue to junc Severn Avenue. Local diversion will be in place.

09 Sep 2009

27 Oct 2010

Coln Crescent (footpath 25) Temporary closure of footpath from adjacent to No 25 to junction with footpath 23 in Trent Road. Alternative route Thames Ave to Severn Ave

09 Sep 2009

21 Oct 2009

Akenfield - Footpath behind Closure in order to construct a cycleway

3 Aug 2009

30 Sep 2009

Green Valley Avenue - footpath Flood alleviation. Temporary footpath closures. Footpath adjacent to northern carriageway between junc with High St and Green Valley Ave. Footpath between Green Valley Ave to junc with Hamble ROad is to be opened for vehicular traffic

04 Aug 2009

15 Sep 2009

Churchfield Flood alleviation scheme will involve road closures and temporary traffic lights

25 Aug 2009

15 Sep 2009

Avonmead - road closure Flood alleviation. Temporary road closure from junction Sherford Rd to end cul-de-sac serving 120-132. Access for pedestrians where practicable

24 Aug 2009

07 Sep 2009

High Street (footpath 20) Flood alleviation. Temporary footpath closure from point adjacent 12 High St to the end of King George V field

27 Jul 2009

28 Aug 2009

Blunsdon Road (incl Lady Lane / Westfield Way) North of Thames Avenue Haydon Wick flood alleviation scheme. Upsize and replace foul sewer and laterals by open cut and insertion. Three stages - High Street to Thames Avenue; Thames Avenue to Pond Street including Blunsdon Road and Pond Street; Lady Lane to Blunsdon Road. Will involve road closures and temporary traffic lights.

01 Jul 2009

7 Jul 2009

Chatsworth Road, footpath west of Flood alleviation scheme. Temporary closure of footpath adjacent to rear of 81 Chatsworth Road to junc Blunsdon Road

16 Jun 2009

7 Jul 2009

Calder Close Contractor to dig shaft as part of flood alleviation works

15 Jun 2009

6 Jul 2009

Orwell Close (footpath 60) Flood alleviation works by Thames Water. Temporary footpath closure from Orwell Close to Calder Close

02 Jul 2009

16 Jul 2009

Deben Crescent Road closure Flood alleviation works. Temporary road closure from No 17 to end of cul-de-sac. Access for residents only where practicable.

02 Jun 2009

16 Jul 2009

Calder Close (footpath 59) Flood alleviation. Temporary footpath closure from Deben Crescent to Calder Close, alternative route will be in place

18 June 2009

16 Jul 2009

Deben Crescent (footpath 59) Flood alleviation. Temporary footpath closure from Deben Crescent to Calder Close, alternative route will be in place

18 Jun 2009

02 Jul 2009

High Street (footpath 1) Temporary footpath closures for flood alleviation scheme. Footpath closure from adjacent to 1 High St to rear of 16 Mellow Ground

01 May 2009

29 Jun 2009

Thames Avenue Flood alleviation scheme. Temporary road closure from junc Blunsdon Road to junc Wicks Close. Diversion will be in place via High Street, The Brow, Haydonleigh Drive and Westfield Way and vice versa.

05 May 2009

23 Jun 2009

Holmleigh (outside nos 1 - 25 Southern Electric to overlay existing lv cables.

26 Jan 2009

20 Feb 2009

Wheatlands Scottish and Southern energy to overlay existing cables inc joint holes

05 Jan 2009

30 Jan 2009

High Street Temporary traffic signals to be used by Thames Water in conjunction with flood alleviation works

28 Jul 2008

21 Sep 2008

Avonmead Sewer repair works from 82 to 1 Sherford (side of). Works to be undertaken by Thames Water as part of the flood alleviation scheme

17 Jul 2008

01 Sep 2008

High Street Sewer repair works to be undertaken by Thames Water as part of the flood alleviation scheme

14 Jul 2008

29 Aug 2008

Churchfield Sewer repair works to be undertaken by Thames Water as part of the flood alleviation scheme

14 Jul 2008

29 Aug 2008

Elstree Way near Lady Lane junction Installation of hv cable to be undertaken by Scottish and Soutern Energy

20 Feb 2008

14 Mar 2008
Helmsdale / Torridge Close / Haydon Court Scottish and Southern Energy laying new cables.

2 Jan 2008

29 Feb 2008

Elstree Way at jnc with Lady Lane and Shepperton Way Scottish and Southern Energy overlay works

7 Jan 2008

28 Jan 2008

Pen Close Road closure to allow SCS to carry out resurfacing works between 9am and 5pm.

21 Aug 2007

24 Aug 2007

Haydon End Lane Temporary Closure between Osterley Road and a point 50m beyond end of Capesthorne Drive. Diversion is via Osterley Road and Capesthorne Drive.

01 Jul 2007

08 Sep 2007

High Street (adjacent to no 2) Installation of gulley and frame in carriageway with temporary traffic control.

12 Mar 2007

16 Mar 2007

Blunsdon Road Works to culvert by Halcrow. Access will be maintained for pedestrians.

05 Feb 2007

05 Feb 2007

Westfield Way Building of new footpath and crossing between Thames Avenue and Osterley Road. Signalling in place as required.

Nov 2006

Jan 2007

Westfield Way Roundabouts Resurfacing Works - www.haydonwickintouch.com/
news_detail.php?nid=991

16 Oct 2006

10 Dec 2006

Whitwoth Road / Thames Avenue roundabout Resurfacing Works
www.haydonwickintouch.com/
news_detail.php?nid=991

16 Oct 2006

10 Dec 2006

Haydon End Lane Closure to vehicular traffic for works to take place to footway / cycleway.

06 Mar 2006

08 Sep 2006

Thames Avenue Installation of Kassell Kerbs at bus stops to enable passengers to enter and exit the bus on one level.

17 Jul 2006

18 Aug 2006

Lady Lane Cycleway Installation of O2 telephone apparatus

26 Jun 2006

21 Jul 2006

Footpath 3 which crosses Haydon Brook for 20m Temporary closure. Alternative route via crossing approx 100m east of closure. To allow contractor to repair bridge.

17 Jul 2005

11 Jun 2006

Westfield Way adjacent to Primrose Close Replacement of sewer cover in carriageway, with temporary traffic signals for one day.

05 May 2006

05 May 2006

Haydon End Lane (near Priory Vale) Closure of section of carriageway. Contractor to construct new sewers and carriageway. Alternative route via temporarily constructed carriageway.

11 Nov 2005

01 Apr 2006

Footpath along Westfield Way Programmed for construction March 2006
Westfield Way (Woodhall r/a - Rosemary Close r/a) Improvements to carriageway

13 Feb 2006

23 Feb 2006

Corfe Close + Avonmead 3,5 & 9 Mains and service works by Wales and West

30 Jan 2006

20 Feb 2006

Resurfacing of Westfield Way Uneven carriageway to be repaired

30 Jan 2006

3 weeks

Arun Road Mains and service work by Wales and West Utilities

3 Jan 2006

30 Jan 2006

Avonmead Transco will be carrying out mains and service work. Temporary traffic control will be in place.

15 Aug 2005

15 Jan 2006

Thamesdown Drive Duct laying by BT. Lane closures as necessary.

10 Nov 2005

04 Jan 2006

Avonmead cul-de-sac to 111 Thrushel Close and Sherford Road

(Provisional)

Micro-asphalt to carriageway. Road closed with access for residents and emergency vehicles. Traffic marshals on site to guide vehicles. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671.

28 Sep 2005

12 Oct 2005

Wicks Close Micro-asphalt to carriageway. Road closed with access for residents and emergency vehicles. Traffic marshals on site to guide vehicles. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671.

28 Sep 2005

12 Oct 2005

Paddock Close Micro-asphalt to carriageway. Road to remain open with lane closure controlled by traffic marshals. Mon - Fri 0930 - 1800. The contractor is Colas Ltd. Contact Nigel Thorne 07836 294671.

28 Sep 2005

12 Oct 2005

Thames Avenue / Blunsdon Road Transco will be carrying out mains and service work. Temporary traffic control will be in place.

08 Aug 2005

12 Sep 2005

High St, The Brow, Blunsdon Road, Green Valley Avenue

Transco will be carrying out mains and service work. Temporary traffic control will be in place as necessary, two or three way signals.

05 May 2005

02 Sep 2005

Thames Avenue / Blunsdon Road junction

Transco will be carrying out mains and service work. Temporary traffic control will be in place.

22 Aug 2005

New Allotments soon to become a Reality 8 March 2010 Regular readers of our articles will know that we have been working for some months with residents, Thames Water and the Borough and Par


LA School Governor Vacancies in the Ward 3 March 2010 We have just been advised by Swindon Borough Council that Abbey Meads Community Primary School and Greenmeadow Primary


Requests for Council Services - February Report 1 March 2010 We receive regular reports from the Borough Council on what local residents have been calling in about. In February easi


Parliamentary Candidate speaks out on Planning Policy 1 March 2010 Conservatives Will Allow Local Communities To Shape The Future Character Of Their Neighbourhoods - Unlike Labour, Who Turned House buil


Residents' Verdict on the Pot Hole Repairs 26 February 2010 During the last month, we held a poll on how residents thought the Council was dealing with the problem of pot holes after the damag


Stop Press - Full Steam Ahead for New Allotments 26 February 2010 We are delighted to announce we have just been advised that Persimmon Homes has agreed to change the covenant on the land adjacent


Haydon Brook - Update Report 12 February 2010 Yesterday, Cllr David Renard met with officers from the Environment Agency (EA) and Swindon Council (SBC) Highways to review pr